Preliminary Design Study

In 2003, MTO completed a Preliminary Design and MTO Class EA for the widening of Highway 17 from Arnprior to 5 km west of Bruce Street in Renfrew.

A Transportation Environmental Study Report (TESR) was completed in 2003 and includes a summary of the public consultation, analysis and evaluation of alternatives, public and agency comments, and the Recommended Plan including commitments to mitigate any residual effects of the project. The 2003 TESR is available for reference on the Documentation page.

Two phases of twinning recommended in the 2003 TESR have been constructed. Phase 1 from Regional Road 29 to Division Street was completed in 2012, and Phase 2 from Division Street to Scheel Drive was completed in 2017. An interim interchange at Calabogie Road / McLean Drive was constructed in 2023.

We Want to Hear from You!

To be added to the study contact list, please Contact Us.
If you have questions or comments for the Project Team, please Contact Us.